+7 (495) 748-46-72
  • ext. 1
    Sales
  • ext. 2
    Purchases
  • ext. 0
    Secretary
From design to implementation
From design to implementation
Under each assembly (assembly) developed production technology card, which allowed time to normalize the production of elements design and, most importantly, to monitor product quality
Own production
Own production
Up to 70% of the production installation works
we were able to move the factory. The technologically
equipped workshop master is much easier to provide
guaranteed high quality.
Turnkey installation
Turnkey installation
We strive to design the system so, then so prepare to
production of all the structural elements to the facility ready
the product was collected as a LEGO designer.
From design to implementation
From design to implementation
Under each assembly (assembly) developed production technology card, which allowed time to normalize the production of elements design and, most importantly, to monitor product quality
Own production
Own production
Up to 70% of the production installation works
we were able to move the factory. The technologically
equipped workshop master is much easier to provide
guaranteed high quality.
Turnkey installation
Turnkey installation
We strive to design the system so, then so prepare to
production of all the structural elements to the facility ready
the product was collected as a LEGO designer.
CHU Central heating
units
BHS Block heating
stations
Cooling
centers
Pumping
stations
Reconstruction of CHU and ITS

Products

CHU
Central heating units
BHS
Block heating stations
Cooling centers
Cooling centers
Pumping stations
Reconstruction of CHU and ITS

About us

Often, the problem of construction of the organizer - at the junction, in coordination among the various sub-contractors: a time to start the work, and the previous is not done yet. We moved their scope of work in the workshop, to minimize the time of presence on the site. Thus, simplified planning colleagues.

use 20 years experience

Maximumguild readiness

Save time project 2 times

Normal ITP installation process
OMP Engineering
Make
mounting/
technological
project.
Without waiting for delivery
equipment, manufacture
pipelines
in the shop.
In the factory
conditions mount
equipment,
conducting tests.
Mount large
the nodes, being
the area minimum
time.
Double quality + half timeline

Qualityincorporated into the technology

Callback

Send letter